{"id":26788,"date":"2026-03-12T11:17:11","date_gmt":"2026-03-12T10:17:11","guid":{"rendered":"https:\/\/www.projectforbuilding.com\/?p=26788"},"modified":"2026-06-25T18:27:09","modified_gmt":"2026-06-25T16:27:09","slug":"cam-construction-2026-what-changes","status":"publish","type":"post","link":"https:\/\/www.projectforbuilding.com\/en\/blog\/cam-construction-2026-what-changes\/","title":{"rendered":"CAM Building Requirements 2026: what changes for designers and construction companies"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"26788\" class=\"elementor elementor-26788 elementor-26786\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"wd-negative-gap elementor-section elementor-top-section elementor-element elementor-element-1279711b elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"1279711b\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-49c58d98\" data-id=\"49c58d98\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-ff69b61 elementor-widget elementor-widget-wd_text_block\" data-id=\"ff69b61\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;highlighted_vertical_offset&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_tablet&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_mobile&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]}}\" data-widget_type=\"wd_text_block.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"wd-text-block reset-last-child text-left\">\n\t\t\t\n\t\t\t<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">On 2 February 2026, the new <strong>Minimum Environmental Criteria for construction (CAM)<\/strong> officially came into force, updated by <strong>Ministerial Decree of 24 November 2025<\/strong>.<\/span><\/p><p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">This is not just a simple regulatory update. <\/span><a href=\"https:\/\/ance.it\/2025\/12\/cam-edilizia-pubblicato-il-nuovo-decreto-tutte-le-novita-operative-dal-2026\"><span style=\"font-weight: 400;\">The new <strong>CAM Building Requirements <\/strong><\/span><b>2026 <\/b>decree<\/a><span style=\"font-weight: 400;\"> redefines the environmental requirements for design, construction products and site management, aligning them with the <strong>Public Contracts Code (Legislative Decree 36\/2023)<\/strong>.<\/span><\/p><p style=\"text-align: justify;\">The message is clear: sustainability is the framework that runs through the entire design process, not a final requirement to be checked at the end.<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7c733a4 wd-width-100 elementor-widget elementor-widget-wd_title\" data-id=\"7c733a4\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;highlighted_vertical_offset&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_tablet&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_mobile&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]}}\" data-widget_type=\"wd_title.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"title-wrapper wd-set-mb reset-last-child wd-title-color-primary wd-title-style-underlined wd-title-size-small text-left\">\n\n\t\t\t\n\t\t\t<div class=\"liner-continer\">\n\t\t\t\t<h4 class=\"woodmart-title-container title wd-fontsize-m\">What changes in the 2026 CAM Building Requirements compared to 2022<br \/>\n<\/h4> \n\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7d0289b elementor-widget elementor-widget-wd_text_block\" data-id=\"7d0289b\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;highlighted_vertical_offset&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_tablet&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_mobile&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]}}\" data-widget_type=\"wd_text_block.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"wd-text-block reset-last-child text-left\">\n\t\t\t\n\t\t\t<p style=\"text-align: justify;\">Compared to the 2022 CAM, the new decree introduces a framework that is more consistent with the current regulatory context and strengthens the obligation to apply the criteria from the earliest stages.<\/p><p style=\"text-align: justify;\">Environmental criteria must already be included in the <strong>Design Brief Document (DIP)<\/strong>. The designer is required to prepare a CAM Report and justify any technical derogations.<\/p><p style=\"text-align: justify;\">This means that the <strong>2026<\/strong> <strong>CAM Building Requirements<\/strong> directly affect preliminary decisions: materials, bills of quantities, environmental performance and tender criteria.<\/p><p style=\"text-align: justify;\">The decree is part of the framework of the <strong>National Action Plan for Green Public Procurement<\/strong> <strong>(PAN GPP)<\/strong>, which makes the application of Minimum Environmental Criteria mandatory in public procurement and uses procurement as a lever to steer the market towards genuinely sustainable construction.<\/p><p style=\"text-align: justify;\">At European level, <strong>Green Public Procurement<\/strong> is now a key tool for the decarbonisation of the construction sector and for the adoption of a life-cycle approach to building works.<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-54211f0 wd-width-100 elementor-widget elementor-widget-wd_title\" data-id=\"54211f0\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;highlighted_vertical_offset&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_tablet&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_mobile&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]}}\" data-widget_type=\"wd_title.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"title-wrapper wd-set-mb reset-last-child wd-title-color-primary wd-title-style-underlined wd-title-size-small text-left\">\n\n\t\t\t\n\t\t\t<div class=\"liner-continer\">\n\t\t\t\t<h4 class=\"woodmart-title-container title wd-fontsize-m\">The new requirements for construction products and recycled materials<\/h4> \n\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-053b460 elementor-widget elementor-widget-wd_text_block\" data-id=\"053b460\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;highlighted_vertical_offset&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_tablet&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_mobile&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]}}\" data-widget_type=\"wd_text_block.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"wd-text-block reset-last-child text-left\">\n\t\t\t\n\t\t\t<p style=\"text-align: justify;\">One of the most significant aspects of the new CAM concerns <strong>CAM-compliant products<\/strong> and the recycled content of construction materials.<\/p><p style=\"text-align: justify;\">The decree confirms and strengthens the minimum percentages of recycled material, provides clearer regulation on End of Waste and introduces greater clarity regarding verification tools.<\/p><p style=\"text-align: justify;\">In particular, there is growing attention to <strong>recycled materials in construction<\/strong>, both in quantitative terms and in terms of traceability and verification. It is not enough to declare a percentage: it must be demonstrated.<\/p><p style=\"text-align: justify;\">This means greater responsibility for manufacturers and suppliers in managing technical and environmental documentation.<\/p><p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The approach is consistent with a vision of <\/span><a href=\"https:\/\/www.projectforbuilding.com\/en\/recycling\/\"><span style=\"font-weight: 400;\">sustainable construction<\/span><\/a><span style=\"font-weight: 400;\"> based on:<\/span><\/p><ul style=\"text-align: justify;\"><li style=\"font-weight: 400;\" aria-level=\"1\">life cycle assessment<\/li><li style=\"font-weight: 400;\" aria-level=\"1\">emissions reduction<\/li><li style=\"font-weight: 400;\" aria-level=\"1\">circular economy<\/li><li style=\"font-weight: 400;\" aria-level=\"1\">supply chain transparency<\/li><\/ul><p style=\"text-align: justify;\">This is where specific company choices come into play, choices that can help construction companies and designers select their partners with confidence. At Project For Building, we have chosen to <strong>certify the way we work<\/strong>.<\/p><p style=\"text-align: justify;\">We take full responsibility for our production process.<\/p><p style=\"text-align: justify;\"><span style=\"color: #99cc00;\"><b>For this reason, we put you in a position to take part in a public tender with the assurance of using CAM-compliant construction products, supported by verifiable certifications and by a technical team that assists you in drafting the specifications.<\/b><\/span><\/p><p style=\"text-align: justify;\">For our company, sustainability is not a claim, but a measurable and documented process.<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-72a0e02 elementor-widget__width-auto elementor-widget elementor-widget-wd_button\" data-id=\"72a0e02\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"wd_button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"wd-button-wrapper text-center\" >\n\t\t\t<a class=\"btn btn-style-bordered btn-shape-rectangle btn-size-default btn-color-white btn-icon-pos-right\"  href=\"https:\/\/www.projectforbuilding.com\/wp-content\/uploads\/2025\/11\/ProjectforBuilding-Bilancio-di-sostenibilita_2024_def-min.pdf\" target=\"_blank\">\n\t\t\t\t<span class=\"wd-btn-text\" data-elementor-setting-key=\"text\">\n\t\t\t\t\tSustainability Report - Environmental data and indicators\t\t\t\t<\/span>\n\n\t\t\t\t\t\t\t<\/a>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ab895b7 elementor-widget elementor-widget-spacer\" data-id=\"ab895b7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"spacer.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-spacer\">\n\t\t\t<div class=\"elementor-spacer-inner\"><\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bab55a5 wd-width-100 elementor-widget elementor-widget-wd_title\" data-id=\"bab55a5\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;highlighted_vertical_offset&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_tablet&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_mobile&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]}}\" data-widget_type=\"wd_title.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"title-wrapper wd-set-mb reset-last-child wd-title-color-primary wd-title-style-underlined wd-title-size-small text-left\">\n\n\t\t\t\n\t\t\t<div class=\"liner-continer\">\n\t\t\t\t<h4 class=\"woodmart-title-container title wd-fontsize-m\">CAM certifications and compliance tools<\/h4> \n\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3b3b6bd elementor-widget elementor-widget-wd_text_block\" data-id=\"3b3b6bd\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;highlighted_vertical_offset&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_tablet&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_mobile&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]}}\" data-widget_type=\"wd_text_block.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"wd-text-block reset-last-child text-left\">\n\t\t\t\n\t\t\t<p>In the new regulatory framework, <strong>CAM certifications<\/strong> and tools for demonstrating compliance play a central role.<\/p><p style=\"text-align: justify;\">These include:<\/p><ul style=\"text-align: justify;\"><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">EPD (Environmental Product Declaration) according to UNI EN 15804<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\">ReMade and Second Life Plastic certifications<\/li><li style=\"font-weight: 400;\" aria-level=\"1\">Made Green in Italy scheme<\/li><li style=\"font-weight: 400;\" aria-level=\"1\">mass balance-based certifications<\/li><li style=\"font-weight: 400;\" aria-level=\"1\">documentation compliant with End of Waste regulations<\/li><\/ul><p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Talking about <\/span><a href=\"https:\/\/www.projectforbuilding.com\/en\/company\/#certificazioni\"><span style=\"font-weight: 400;\">CAM certifications<\/span><\/a><span style=\"font-weight: 400;\"> means talking about competitiveness in public procurement. They are not accessory elements, but strategic levers during the tender stage.<\/span><\/p><p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Technical offers must clearly demonstrate the recycled content, material traceability and consistency with the required environmental criteria.<\/span><\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-47c3575 wd-width-100 elementor-widget elementor-widget-wd_title\" data-id=\"47c3575\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;highlighted_vertical_offset&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_tablet&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_mobile&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]}}\" data-widget_type=\"wd_title.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"title-wrapper wd-set-mb reset-last-child wd-title-color-primary wd-title-style-underlined wd-title-size-small text-left\">\n\n\t\t\t\n\t\t\t<div class=\"liner-continer\">\n\t\t\t\t<h4 class=\"woodmart-title-container title wd-fontsize-m\">The impact of CAM on public tenders and specifications<\/h4> \n\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-22c6b5e elementor-widget elementor-widget-wd_text_block\" data-id=\"22c6b5e\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;highlighted_vertical_offset&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_tablet&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_mobile&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]}}\" data-widget_type=\"wd_text_block.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"wd-text-block reset-last-child text-left\">\n\t\t\t\n\t\t\t<p style=\"text-align: justify;\">The new 2026 CAM Building Requirements change the way specifications and tenders are prepared.<\/p><p style=\"text-align: justify;\">The designer must integrate environmental criteria from the Preliminary Technical and Economic Feasibility Design stage (PFTE).<br \/>The contractor must organise the construction site in a way that is consistent with waste recovery and environmental management objectives.<br \/>The supplier must ensure speed, clear documentation and compliant products.<\/p><p style=\"text-align: justify;\">Operational tools are introduced, such as the Construction and Demolition Waste Reuse and Recovery Plan and the Construction Site Waste Management Plan, with the objective of achieving 70% recovery.<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-14a4519 elementor-widget elementor-widget-wd_text_block\" data-id=\"14a4519\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;highlighted_vertical_offset&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_tablet&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_mobile&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]}}\" data-widget_type=\"wd_text_block.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"wd-text-block reset-last-child text-left\">\n\t\t\t\n\t\t\t<p style=\"text-align: justify;\"><span style=\"color: #99cc00;\"><b>The sustainable construction site must be part of a verifiable and documented process. For this reason, at Project For Building we provide certifications, technical data sheets, specifications, and BIM and CAD libraries for all our products.<\/b><\/span><\/p><p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Choosing <\/span><a href=\"https:\/\/www.projectforbuilding.com\/en\/products\/construction\/granchio\/\"><b>CAM compliant products<\/b><\/a><span style=\"font-weight: 400;\"> correctly in construction directly affects environmental scores, the quality of the tender and the reduction of risks during the validation phase.<\/span><\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0000c5a wd-width-100 elementor-widget elementor-widget-wd_title\" data-id=\"0000c5a\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;highlighted_vertical_offset&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_tablet&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_mobile&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]}}\" data-widget_type=\"wd_title.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"title-wrapper wd-set-mb reset-last-child wd-title-color-primary wd-title-style-underlined wd-title-size-small text-left\">\n\n\t\t\t\n\t\t\t<div class=\"liner-continer\">\n\t\t\t\t<h4 class=\"woodmart-title-container title wd-fontsize-m\">Project For Building: technical partner for sustainable construction<\/h4> \n\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0ed5a0f elementor-widget elementor-widget-wd_text_block\" data-id=\"0ed5a0f\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;highlighted_vertical_offset&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_tablet&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;highlighted_vertical_offset_mobile&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]}}\" data-widget_type=\"wd_text_block.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"wd-text-block reset-last-child text-left\">\n\t\t\t\n\t\t\t<p style=\"text-align: justify;\">Our company was founded with an industrial vocation rooted in the circular economy. The use of recycled plastic is an integral part of our production process.<\/p><p style=\"text-align: justify;\">For us, sustainability is a structural fact: regenerated raw material re-enters the industrial cycle in a controlled way, reducing waste and optimising resources.<\/p><p style=\"text-align: justify;\">And our value grows through the <strong>technical support<\/strong> we provide to our customers.<\/p><p style=\"text-align: justify;\">We support designers and construction companies in choosing materials compliant with the <strong>2026 CAM Building Requirements<\/strong>, in reading technical specifications, and in preparing the documentation required to demonstrate recycled content and environmental compliance.<\/p><p style=\"text-align: justify;\">Thanks to an <strong>integrated logistics network<\/strong>, we ensure fast deliveries throughout the national territory, an element that during the tender phase can matter just as much as certification.<\/p><p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">We are not \u201cgreen\u201d as a positioning choice. We are green by production nature.<\/span><\/p><p style=\"text-align: justify;\">f you are working on a 2026 specification or reviewing your suppliers from a CAM perspective, the technical team at Project For Building is available for an operational discussion.<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-091fcd5 elementor-widget__width-auto elementor-widget elementor-widget-wd_button\" data-id=\"091fcd5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"wd_button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"wd-button-wrapper text-center\" >\n\t\t\t<a class=\"btn btn-style-bordered btn-shape-rectangle btn-size-default btn-color-white btn-icon-pos-right\"  href=\"https:\/\/www.projectforbuilding.com\/en\/contact\/\">\n\t\t\t\t<span class=\"wd-btn-text\" data-elementor-setting-key=\"text\">\n\t\t\t\t\tREQUEST TECHNICAL SUPPORT &amp; INFO\t\t\t\t<\/span>\n\n\t\t\t\t\t\t\t<\/a>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8f1b42b elementor-widget__width-auto elementor-widget elementor-widget-wd_button\" data-id=\"8f1b42b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"wd_button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"wd-button-wrapper text-center\" >\n\t\t\t<a class=\"btn btn-style-bordered btn-shape-rectangle btn-size-default btn-color-white btn-icon-pos-right\"  href=\"https:\/\/www.linkedin.com\/company\/project-for-building-spa\/\">\n\t\t\t\t<span class=\"wd-btn-text\" data-elementor-setting-key=\"text\">\n\t\t\t\t\tFOLLOW US ON Linkedin\t\t\t\t<\/span>\n\n\t\t\t\t\t\t\t<\/a>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2821018 elementor-widget elementor-widget-spacer\" data-id=\"2821018\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"spacer.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-spacer\">\n\t\t\t<div class=\"elementor-spacer-inner\"><\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d77cb0e elementor-widget elementor-widget-wd_image_or_svg\" data-id=\"d77cb0e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"wd_image_or_svg.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\n\t\t<div class=\"wd-image text-center photoswipe-images\">\n\t\t\t\t\t\t\t<a  href=\"https:\/\/www.projectforbuilding.com\/wp-content\/uploads\/2026\/06\/Project-for-building-banner-chiusuraENG.jpg\"data-width=\"1128\" data-height=\"191\" data-elementor-open-lightbox=\"no\" aria-label=\"Image link\">\n\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1128\" height=\"191\" src=\"https:\/\/www.projectforbuilding.com\/wp-content\/uploads\/2026\/06\/Project-for-building-banner-chiusuraENG.jpg\" class=\"attachment-large size-large\" alt=\"Project For Building, a company specialized in transforming recycled plastic into innovative and sustainable solutions for construction\" srcset=\"https:\/\/www.projectforbuilding.com\/wp-content\/uploads\/2026\/06\/Project-for-building-banner-chiusuraENG.jpg 1128w, https:\/\/www.projectforbuilding.com\/wp-content\/uploads\/2026\/06\/Project-for-building-banner-chiusuraENG-400x68.jpg 400w, https:\/\/www.projectforbuilding.com\/wp-content\/uploads\/2026\/06\/Project-for-building-banner-chiusuraENG-768x130.jpg 768w, https:\/\/www.projectforbuilding.com\/wp-content\/uploads\/2026\/06\/Project-for-building-banner-chiusuraENG-430x73.jpg 430w, https:\/\/www.projectforbuilding.com\/wp-content\/uploads\/2026\/06\/Project-for-building-banner-chiusuraENG-700x119.jpg 700w, https:\/\/www.projectforbuilding.com\/wp-content\/uploads\/2026\/06\/Project-for-building-banner-chiusuraENG-300x51.jpg 300w\" sizes=\"auto, (max-width: 1128px) 100vw, 1128px\" \/>\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>On 2 February 2026, the new Minimum Environmental Criteria for construction (CAM) officially came into force, updated by Ministerial Decree<\/p>\n","protected":false},"author":2,"featured_media":28210,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[161],"tags":[229,230,231,232,233,234],"class_list":["post-26788","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-229","tag-cam","tag-edilizia","tag-imprese","tag-nuove-regole","tag-progettisti"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>CAM Edilizia 2026: cosa cambia per progettisti e imprese - Project for Building - Innovative products for the building industry<\/title>\n<meta name=\"description\" content=\"Dal 2 febbraio 2026 sono entrati ufficialmente in vigore i nuovi Criteri Ambientali Minimi per l\u2019edilizia per ridefinire i criteri ambientali\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.projectforbuilding.com\/en\/blog\/cam-construction-2026-what-changes\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CAM Edilizia 2026: cosa cambia per progettisti e imprese\" \/>\n<meta property=\"og:description\" content=\"Dal 2 febbraio 2026 sono entrati ufficialmente in vigore i nuovi Criteri Ambientali Minimi per l\u2019edilizia per ridefinire i criteri ambientali\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.projectforbuilding.com\/en\/blog\/cam-construction-2026-what-changes\/\" \/>\n<meta property=\"og:site_name\" content=\"Project for Building - Innovative products for the building industry\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/projectforbuilding\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-12T10:17:11+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-25T16:27:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.projectforbuilding.com\/wp-content\/uploads\/2026\/01\/Griglia-Salvaprato-Green-Parking-Project-for-Building-.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"700\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Project For Building\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Project For Building\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/blog\\\/cam-construction-2026-what-changes\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/blog\\\/cam-construction-2026-what-changes\\\/\"},\"author\":{\"name\":\"Project For Building\",\"@id\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/#\\\/schema\\\/person\\\/975b2a715f21bd03b94d54c1c5301193\"},\"headline\":\"CAM Building Requirements 2026: what changes for designers and construction companies\",\"datePublished\":\"2026-03-12T10:17:11+00:00\",\"dateModified\":\"2026-06-25T16:27:09+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/blog\\\/cam-construction-2026-what-changes\\\/\"},\"wordCount\":907,\"publisher\":{\"@id\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/blog\\\/cam-construction-2026-what-changes\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.projectforbuilding.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/05CAM-BLOG-1200x700eng.jpg\",\"keywords\":[\"2026\",\"cam\",\"edilizia\",\"imprese\",\"nuove regole\",\"progettisti\"],\"articleSection\":[\"Blog\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/blog\\\/cam-construction-2026-what-changes\\\/\",\"url\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/blog\\\/cam-construction-2026-what-changes\\\/\",\"name\":\"CAM Edilizia 2026: cosa cambia per progettisti e imprese - Project for Building - Innovative products for the building industry\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/blog\\\/cam-construction-2026-what-changes\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/blog\\\/cam-construction-2026-what-changes\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.projectforbuilding.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/05CAM-BLOG-1200x700eng.jpg\",\"datePublished\":\"2026-03-12T10:17:11+00:00\",\"dateModified\":\"2026-06-25T16:27:09+00:00\",\"description\":\"Dal 2 febbraio 2026 sono entrati ufficialmente in vigore i nuovi Criteri Ambientali Minimi per l\u2019edilizia per ridefinire i criteri ambientali\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/blog\\\/cam-construction-2026-what-changes\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/blog\\\/cam-construction-2026-what-changes\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/blog\\\/cam-construction-2026-what-changes\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.projectforbuilding.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/05CAM-BLOG-1200x700eng.jpg\",\"contentUrl\":\"https:\\\/\\\/www.projectforbuilding.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/05CAM-BLOG-1200x700eng.jpg\",\"width\":1200,\"height\":700,\"caption\":\"Focus on CAM Building Requirements 2026, environmental criteria and compliant construction solutions.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/blog\\\/cam-construction-2026-what-changes\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"CAM Edilizia 2026: cosa cambia per progettisti e imprese\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/\",\"name\":\"Project for Building - Prodotti innovativi per l'edilizia\",\"description\":\"From waste to finished product\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/#organization\",\"name\":\"Project for Building - Prodotti innovativi per l'edilizia\",\"url\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.projectforbuilding.com\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Logo_Project-for-Building-30th.svg\",\"contentUrl\":\"https:\\\/\\\/www.projectforbuilding.com\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/Logo_Project-for-Building-30th.svg\",\"width\":499,\"height\":183,\"caption\":\"Project for Building - Prodotti innovativi per l'edilizia\"},\"image\":{\"@id\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/projectforbuilding\",\"https:\\\/\\\/www.instagram.com\\\/projectforbuilding\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@projectforbuildingspa7655\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/project-for-building-spa\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.projectforbuilding.com\\\/en\\\/#\\\/schema\\\/person\\\/975b2a715f21bd03b94d54c1c5301193\",\"name\":\"Project For Building\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"CAM Edilizia 2026: cosa cambia per progettisti e imprese - Project for Building - Innovative products for the building industry","description":"Dal 2 febbraio 2026 sono entrati ufficialmente in vigore i nuovi Criteri Ambientali Minimi per l\u2019edilizia per ridefinire i criteri ambientali","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.projectforbuilding.com\/en\/blog\/cam-construction-2026-what-changes\/","og_locale":"en_US","og_type":"article","og_title":"CAM Edilizia 2026: cosa cambia per progettisti e imprese","og_description":"Dal 2 febbraio 2026 sono entrati ufficialmente in vigore i nuovi Criteri Ambientali Minimi per l\u2019edilizia per ridefinire i criteri ambientali","og_url":"https:\/\/www.projectforbuilding.com\/en\/blog\/cam-construction-2026-what-changes\/","og_site_name":"Project for Building - Innovative products for the building industry","article_publisher":"https:\/\/www.facebook.com\/projectforbuilding","article_published_time":"2026-03-12T10:17:11+00:00","article_modified_time":"2026-06-25T16:27:09+00:00","og_image":[{"width":1200,"height":700,"url":"https:\/\/www.projectforbuilding.com\/wp-content\/uploads\/2026\/01\/Griglia-Salvaprato-Green-Parking-Project-for-Building-.jpg","type":"image\/jpeg"}],"author":"Project For Building","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Project For Building","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.projectforbuilding.com\/en\/blog\/cam-construction-2026-what-changes\/#article","isPartOf":{"@id":"https:\/\/www.projectforbuilding.com\/en\/blog\/cam-construction-2026-what-changes\/"},"author":{"name":"Project For Building","@id":"https:\/\/www.projectforbuilding.com\/en\/#\/schema\/person\/975b2a715f21bd03b94d54c1c5301193"},"headline":"CAM Building Requirements 2026: what changes for designers and construction companies","datePublished":"2026-03-12T10:17:11+00:00","dateModified":"2026-06-25T16:27:09+00:00","mainEntityOfPage":{"@id":"https:\/\/www.projectforbuilding.com\/en\/blog\/cam-construction-2026-what-changes\/"},"wordCount":907,"publisher":{"@id":"https:\/\/www.projectforbuilding.com\/en\/#organization"},"image":{"@id":"https:\/\/www.projectforbuilding.com\/en\/blog\/cam-construction-2026-what-changes\/#primaryimage"},"thumbnailUrl":"https:\/\/www.projectforbuilding.com\/wp-content\/uploads\/2026\/06\/05CAM-BLOG-1200x700eng.jpg","keywords":["2026","cam","edilizia","imprese","nuove regole","progettisti"],"articleSection":["Blog"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.projectforbuilding.com\/en\/blog\/cam-construction-2026-what-changes\/","url":"https:\/\/www.projectforbuilding.com\/en\/blog\/cam-construction-2026-what-changes\/","name":"CAM Edilizia 2026: cosa cambia per progettisti e imprese - Project for Building - Innovative products for the building industry","isPartOf":{"@id":"https:\/\/www.projectforbuilding.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.projectforbuilding.com\/en\/blog\/cam-construction-2026-what-changes\/#primaryimage"},"image":{"@id":"https:\/\/www.projectforbuilding.com\/en\/blog\/cam-construction-2026-what-changes\/#primaryimage"},"thumbnailUrl":"https:\/\/www.projectforbuilding.com\/wp-content\/uploads\/2026\/06\/05CAM-BLOG-1200x700eng.jpg","datePublished":"2026-03-12T10:17:11+00:00","dateModified":"2026-06-25T16:27:09+00:00","description":"Dal 2 febbraio 2026 sono entrati ufficialmente in vigore i nuovi Criteri Ambientali Minimi per l\u2019edilizia per ridefinire i criteri ambientali","breadcrumb":{"@id":"https:\/\/www.projectforbuilding.com\/en\/blog\/cam-construction-2026-what-changes\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.projectforbuilding.com\/en\/blog\/cam-construction-2026-what-changes\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.projectforbuilding.com\/en\/blog\/cam-construction-2026-what-changes\/#primaryimage","url":"https:\/\/www.projectforbuilding.com\/wp-content\/uploads\/2026\/06\/05CAM-BLOG-1200x700eng.jpg","contentUrl":"https:\/\/www.projectforbuilding.com\/wp-content\/uploads\/2026\/06\/05CAM-BLOG-1200x700eng.jpg","width":1200,"height":700,"caption":"Focus on CAM Building Requirements 2026, environmental criteria and compliant construction solutions."},{"@type":"BreadcrumbList","@id":"https:\/\/www.projectforbuilding.com\/en\/blog\/cam-construction-2026-what-changes\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.projectforbuilding.com\/en\/"},{"@type":"ListItem","position":2,"name":"CAM Edilizia 2026: cosa cambia per progettisti e imprese"}]},{"@type":"WebSite","@id":"https:\/\/www.projectforbuilding.com\/en\/#website","url":"https:\/\/www.projectforbuilding.com\/en\/","name":"Project for Building - Prodotti innovativi per l'edilizia","description":"From waste to finished product","publisher":{"@id":"https:\/\/www.projectforbuilding.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.projectforbuilding.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.projectforbuilding.com\/en\/#organization","name":"Project for Building - Prodotti innovativi per l'edilizia","url":"https:\/\/www.projectforbuilding.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.projectforbuilding.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.projectforbuilding.com\/wp-content\/uploads\/2024\/12\/Logo_Project-for-Building-30th.svg","contentUrl":"https:\/\/www.projectforbuilding.com\/wp-content\/uploads\/2024\/12\/Logo_Project-for-Building-30th.svg","width":499,"height":183,"caption":"Project for Building - Prodotti innovativi per l'edilizia"},"image":{"@id":"https:\/\/www.projectforbuilding.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/projectforbuilding","https:\/\/www.instagram.com\/projectforbuilding\/","https:\/\/www.youtube.com\/@projectforbuildingspa7655","https:\/\/www.linkedin.com\/company\/project-for-building-spa\/"]},{"@type":"Person","@id":"https:\/\/www.projectforbuilding.com\/en\/#\/schema\/person\/975b2a715f21bd03b94d54c1c5301193","name":"Project For Building"}]}},"_links":{"self":[{"href":"https:\/\/www.projectforbuilding.com\/en\/wp-json\/wp\/v2\/posts\/26788","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.projectforbuilding.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.projectforbuilding.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.projectforbuilding.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.projectforbuilding.com\/en\/wp-json\/wp\/v2\/comments?post=26788"}],"version-history":[{"count":0,"href":"https:\/\/www.projectforbuilding.com\/en\/wp-json\/wp\/v2\/posts\/26788\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.projectforbuilding.com\/en\/wp-json\/wp\/v2\/media\/28210"}],"wp:attachment":[{"href":"https:\/\/www.projectforbuilding.com\/en\/wp-json\/wp\/v2\/media?parent=26788"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.projectforbuilding.com\/en\/wp-json\/wp\/v2\/categories?post=26788"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.projectforbuilding.com\/en\/wp-json\/wp\/v2\/tags?post=26788"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}